冀中能源峰峰集团抢抓有利时机精心组织煤炭生产
责任编辑:cnlng    浏览:919次    时间: 2024-10-18 10:49:19    | 来源:冀中能源   

免职声明:本网站为公益性网站,部分信息来自网络,如果涉及贵网站的知识产权,请及时反馈,我们承诺第一时间删除!

This website is a public welfare website, part of the information from the Internet, if it involves the intellectual property rights of your website, please timely feedback, we promise to delete the first time.

电话Tel: 19550540085: QQ号: 929496072 or 邮箱Email: Lng@vip.qq.com

摘要:10月份以来,面对煤炭市场持续好转的有利时机,冀中能源峰峰集团坚持依法依规组织生产,严抓安全生产标准化建设,积极推进采掘装备升级,强化煤质全过程管控,力保煤炭生产工作安全高效开展。该集团树牢“不安全无效益”理念,坚持依法依规组织生产,逐级扛牢压实安..

分享到:

10月份以来,面对煤炭市场持续好转的有利时机,冀中能源峰峰集团坚持依法依规组织生产,严抓安全生产标准化建设,积极推进采掘装备升级,强化煤质全过程管控,力保煤炭生产工作安全高效开展。该集团树牢“不安全无效益”理念,坚持依法依规组织生产,逐级扛牢压实安全生产责任。进一步加强对各矿(厂)安全生产工作的监督检查,严格落实安全规程措施要求,扎实开展重大事故隐患排查治理,切实防范化解重大事故隐患。将安全生产标准化管理体系创建作为固本夯基的重要手段,坚持专业评比与综合评比并重,深化最佳、最差生产系统考评,强力推进动态达标、过程达标、结果达标。加强对九龙矿1505工作面、羊东矿8268工作面、08208工作面和大社矿921104工作面过断层,辛安矿11210-2工作面、太行公司一采煤柱工作面过老巷,大社矿二水平电厂煤柱工作面和孙庄采矿公司126402-2工作面初采,羊东矿8476工作面、赤峪煤矿N1401工作面安装和大社矿941202工作面、孙庄采矿公司工广六块煤柱工作面拆除等重点地区的安全管控,确保安全管控到位。

该集团坚持“均衡生产、不搞突击、安全高效”,聚焦提高单产单进水平,积极推进采掘装备升级、技术工艺进步。加速推进大社矿、察尔齐矿智能化矿井建设,积极在有条件的矿井谋划引入盾构机作业线,在羊东矿8476工作面、孙庄采矿公司126402-2采煤工作面应用大功率采煤机。加强瓦斯、水、火等重大灾害防治关键难点攻关,积极推广地面钻井瓦斯抽采技术、穿层预抽钻孔机械扩孔技术,完善和优化地面区域治理远程监测监控系统,着力解决安全生产工作中的“卡脖子”难题。同时,进一步规范新装备应用管理,制定方案,持续跟进,确保应用效果;积极谋划推动深部开采重大灾害治理工程试验,为下步深部资源开采创造条件。

Since October, in the face of the favorable opportunity for the continuous improvement of the coal market, Jizhong Energy Fengfeng Group has adhered to the organization of production according to law and regulations, strictly grasped the construction of safety production standardization, actively promoted the upgrading of mining equipment, strengthened the control of the whole process of coal quality, and ensured the safe and efficient development of coal production. The group firmly adheres to the concept of "unsafe and ineffective", adheres to the organization of production according to law and regulations, and shoulder the responsibility of compaction safety production step by step. Further strengthen the supervision and inspection of the safety work of all mines (factories), strictly implement the safety procedures and measures, solidly carry out the investigation and management of major accident hazards, and effectively prevent and resolve major accident hazards. The creation of safety production standardization management system as an important means of consolidating the foundation, adhere to the professional eva luation and comprehensive eva luation, deepen the best and worst production system eva luation, and strongly promote the dynamic standard, process standard, result standard. Strengthening the fault crossing of Jiwulong Mine 1505 face, Yangdong Mine 8268 face, 08208 face and Dashe Mine 921104 face, Xin 'an Mine 11210-2 face, Taihang Company No. 1 coal pillar face through Lao Xiang, Dashe Mine II level power plant coal pillar face and Sunzhuang Mining Company 126402-2 face, To ensure safety control in place in key areas such as 8476 working face of Yangdong Mine, N1401 working face installation of Chiyu Coal Mine, 941202 working face of Dashe Mine and demolition of Gongguang six coal pillar working face of Sunzhuang Mining Company.

The group insists on "balanced production, no surprise, safety and efficiency", focuses on improving the level of production per unit and actively promotes the upgrading of mining equipment and technological progress. Accelerate the construction of intelligent mines in Dashe Mine and Qarqi Mine, actively introduce shield machine lines in mines with conditions, and apply high-power shearer in the 8476 working face of Yangdong Mine and the 126402-2 coal face of Sunzhuang Mining Company. We strengthened efforts to tackle key difficulties in preventing and controlling gas, water, fire and other major disasters, actively promoted the technology of gas extraction in surface drilling and the technology of mechanical reexpanding through strata pre-pumping and drilling, improved and optimized the remote monitoring and monitoring system for the treatment of ground areas, and focused on solving the "bottleneck" problem in work safety. At the same time, further standardize the application management of new equipment, formulate plans, and continue to follow up to ensure the application effect; Actively plan to promote the deep mining major disaster control project test, and create conditions for the next deep resource mining.


】【打印繁体】【投稿】 【收藏】 【推荐】 【举报】 【评论】 【关闭】【返回顶部