中国石油首批!“零碳智慧园区”建成!
责任编辑:cnlng    浏览:176次    时间: 2024-04-22 11:28:05    | 来源:中国石油报   

免职声明:本网站为公益性网站,部分信息来自网络,如果涉及贵网站的知识产权,请及时反馈,我们承诺第一时间删除!

This website is a public welfare website, part of the information from the Internet, if it involves the intellectual property rights of your website, please timely feedback, we promise to delete the first time.

电话Tel: 19550540085: QQ号: 929496072 or 邮箱Email: Lng@vip.qq.com

摘要:零碳智慧园区,是指通过各种碳减排、碳中和措施,把园区直接或间接产生的二氧化碳排放总量全部抵消,实现碳元素的零排放。近年来,大港油田锚定国家“双碳”目标,落实集团公司“清洁替代、战略接替、绿色转型”三步走总体部署,以所属单位绿电公司园区为试点,结合..

分享到:

零碳智慧园区,是指通过各种碳减排、碳中和措施,把园区直接或间接产生的二氧化碳排放总量全部抵消,实现碳元素的零排放。近年来,大港油田锚定国家“双碳”目标,落实集团公司“清洁替代、战略接替、绿色转型”三步走总体部署,以所属单位绿电公司园区为试点,结合光伏发电、储能、负荷、地热、能源互补及综合利用等技术融合应用,开展智慧“零碳”微网示范区建设,达到零碳、微网、源网荷储目标。

为了实现智慧园区绿色用能,绿电公司自2021年开始逐步开展可再生能源利用工程,全面规划绿电项目建设。截至目前,区内建成地面支架光伏、屋顶支架光伏、屋顶柔性光伏、车棚光伏等,投运装机容量已达3.11兆瓦,年均发电量可达390万千瓦/时。园区成为大规模光伏建设项目的技术摇篮,形成了完善的示范管理、技术体系。

在已开展绿电工程的基础上,绿电公司建成“全电型”新型节能环保食堂和2.1万平米地源热泵供暖,同步规划建设了三维、可视化、实时数据反馈的“零碳智慧能源管理系统”,对园区多种能源系统化管理,并可根据实际需求灵活切换经济或零碳运行方式。建设过程中,园区减排与增氧同步推进。目前,全年产生绿电量可抵消温室气体排放量2千余吨,新增绿化面积12.9万平方米,形成绿植与蓝色光伏板交相掩映的生态空间。

Zero-carbon smart park means that through various carbon reduction and carbon neutral measures, the total carbon dioxide emissions directly or indirectly generated by the park are offset to achieve zero carbon emissions. In recent years, Dagang Oilfield has anchored the national "dual carbon" goal, implemented the overall three-step deployment of "clean substitution, strategic replacement and green transformation" of the Group company, and carried out the construction of smart "zero carbon" micro-grid demonstration area with the pilot of the green power company park of its affiliated unit, combined with the integration and application of technologies such as photovoltaic power generation, energy storage, load, geothermal, energy complementarization and comprehensive utilization. Achieve zero carbon, micro grid, source network load storage goals.

In order to realize the green energy use of the smart park, the Green Power Company has gradually carried out renewable energy utilization projects since 2021, and comprehensively planned the construction of green power projects. Up to now, the area has built ground support photovoltaic, roof support photovoltaic, roof flexible photovoltaic, carport photovoltaic, etc., and the installed capacity of operation has reached 3.11 MW, and the annual power generation can reach 3.9 million kW/h. The park has become the technical cradle of large-scale photovoltaic construction projects, and has formed a perfect demonstration management and technical system.

On the basis of the green power project that has been carried out, the green Power Company has built a "all-electric" new energy-saving and environmental protection canteen and 21,000 square meters of ground source heat pump heating, synchronously planning and building a three-dimensional, visual, real-time data feedback "zero carbon smart energy management system", systematic management of various energy sources in the park, and can flexibly switch economic or zero carbon operation mode according to actual needs. During the construction process, the park's emission reduction and oxygen increase are promoted simultaneously. At present, the annual production of green electricity can offset more than 2,000 tons of greenhouse gas emissions, and the new green area of 129,000 square meters, forming an ecological space with green plants and blue photovoltaic panels.




】【打印繁体】【投稿】 【收藏】 【推荐】 【举报】 【评论】 【关闭】【返回顶部